3404 Campbell Drive
Charlotte
,
NC
28205
$345,000
0.3
acres
City Sewer, City Water, & Tap Fee Required
No HOA
Build your dream home or develop this spacious .275 flat acre lot located in highly desirable Sheffield Park with road frontage. Privacy along this lot, and sounds of nature with Edwards Branch Creek on the back side of property.


Build your dream home or develop this spacious .275 flat acre lot located in highly desirable Sheffield Park with road frontage. Privacy along this lot, and sounds of nature with Edwards Branch Creek on the back side of property.


Personalize a home for this lot
Customize the exterior and interior of the curated design to fit your needs or go the fully custom route.

Choose The Building Path For You
Customize the exterior and interior of the curated design to fit your needs or go the fully custom route.
A new, simplified way to build a home unique to you
1
UNDERSTANDING Your Canvas

.png)
2
A SPACE UNIQUE TO YOU
3
SEEING YOUR HOME in 3d

FAQ
What fees are associated with building with Atmos?
Our fee is 6% of the total build cost (not including land).
How do you vet the builders you work with?
Beyond ensuring they’re properly licensed and insured, we meet every builder in person to make sure they’re a great fit for the Atmos vision and values including prioritizing quality and craftsmanship.
Do I have to have land already?
No, we have a dedicated team in your city working to help you find land.
What are the standard specs for an Atmos home?
You can view our standard specs here.
Can I visit my home during construction?
Of course! Your project manager visits your build site weekly and you can always tag along. These meetings must be scheduled with your project manager to ensure your safety, with the added benefit of being able to answer any questions or concerns while you’re there. Unfortunately, we cannot allow you to visit without your project manager as OSHA and builder’s insurance company limit access for liability issues.
Will my price ever change during construction?
No. The only time your price could change during construction is if you request a change order or we need to activate the escalation clause (for example: if lumber prices increase by 25% after you sign your contract). This is rare so you will be presented with options if this occurs.